Hi there,
With the recent release of the sample data for Counties Power (http://www.emi.ea.govt.nz/Datasets/Supplementary_information/2017), I have some quick questions. From the spreadsheet (20170313_Consumption_
The data is a subset of the full Counties Power network - in this case is provided from one substation (approx 20% of the total network)
Data provided included details of Feeders, Transformers, ICPs, Meters & Consumption - anonymised Looking at the file
Looking at the file 20170313_tx_seas_time_profile.
1. Do we Are you able to say what the name/identifier of the substation was that these feeders/transformers are linked to?
I can see that Feeders are potentially linked to multiple transformers (e.g. from 20170313_tx_seas_time_
2. If so how do feeders, transformers link back to the NSP or POC code as indicated in the file 20170314_Network_supply_
3. Is the relationship as follows? NSP (i.e. Substation) > Feeder > Transformer > ICP